Day 7

Well, it’s really day 5. Michael was at the block on Friday just after lunch, and nothing has changed, so it’s “Before Lunch on Day 5″ photos… but Day 7 sounds luckier.

We have our pipes in the ground, all covered up, and ready for the slab to be prepared and poured later this week. Our pile of grey stuff has even shrunk too.

Our next door neighbours have flipped their plans over, so their driveway is actually the same side as ours - which looks OK based on their block progress so far - as their house looks to have its backyard actually at the back (rather than the side like ours) so our outdoor area should remain pretty private.

So, enjoy the progress so far!

Welcome to 1317

Welcome to 1317

Pipes: from the Front

Pipes: from the Front

1317's Electrical Box

1317's Electrical Box

Inside our electrical box...

Inside our electrical box...

Definately workmen on this site...

Definately workmen on this site...

Rubbish Container starting to fill...

Rubbish Container starting to fill...

Our smaller grey pile...

Our smaller grey pile...

Long shadow on the grey pile

Long shadow on the grey pile

Pipes: the Ensuite

Pipes: the Ensuite

Pipes: the Kitchen

Pipes: the Kitchen

Pipes: Main Bathroom

Pipes: Main Bathroom

Pipes: UFO

Pipes: UFO

Pipes: from the Rear

Pipes: from the Rear

Pipes: Rear of the Block

Pipes: Rear of the Block

Written by marty in: Building, External, Land, Photos |
Aug
27
2009
0

Day 4… let the digging begin

Now up first, apologies for the crappy photos - clearly the iPhone doesn’t match up against my D-SLR. But alas, it was all I had with me so it will do.

This was a totally unplanned trip - traffic in peak hour flew by so I had 30 minutes to spare before my 6:15 Attack so thought I’d detour to the left and go to check on the block.

And we have digging - our lovely flat block is now dug up, with pipework being laid - definately looks like we’re on track for next Wednesday’s launch day.

The key lesson learnt here… keep a better camera handy…

Digging it up

Digging it up

Sunset on Block 1317

Sunset on Block 1317

A pipe at the rear of the house

A pipe at the rear of the house

 
A look at the pipework

A look at the pipework

 
Written by marty in: Building, External, Land, Photos |
Aug
26
2009
0

Day 3

It’s day 3… with a wet week planned, we thought we’d take a look at what’s happened since Monday, especially given Tuesday’s stormy weather.

And our scraping… sorry Matt, our “benching”… has been completed, and deposited with a mount of grey stuff. From looking at some of the other blocks, we’re guessing this is placed over the site when pipes have been laid - so that must mean we should be seeing pipes when we next get to the block over the weekend.

So we still appear to be on schedule for our 2nd September slab laying, so fingers crossed the weather holds up - today was forecast for cool with showers and wind, but yet only had a brief drizzle surrounded by sunshine - so let’s keep it up!

It’s strange though, the block next to us (1318) started before us but looks to have hit a stump and not done any work except the benching and a fence - so will be interesting to see how it progresses. We also saw that 1319 has been benched, so a set of 3 blocks will be going up around the same time.

So new on our block today was, apart from our mound of grey stuff, the important pieces - a toilet.

Enough chit-chat… photo time!

Protecting the Driveway

Protecting the Driveway

The important gear...

The important gear...

Following 120km/h winds

Following 120km/h winds

Our Back Yard...

Our Back Yard...

Mound of... uh... grey stuff

Mound of... uh... grey stuff

Grey Stuff up close

Grey Stuff up close

Looking through the Fence

Looking through the Fence

Our Marker... with fence

Our Marker... with fence

Sunset on 1317

Sunset on 1317

Written by marty in: Building, External, Land, Photos |
Aug
24
2009
5

Day 1

It’s here… day 1 - our site start happened today, Monday 24th August.

Given I had the day off from work, Mikey and I decided to go for a drive to Point Cook for lunch, and not only did we see our scraped site, but we got to watch them scrape our site.

The workers probably were wondering who the weird guy was taking photos, but that would have been me.

With wild weather forecast this week, it will be interesting to see how it all progresses, with our slab date scheduled for September 2nd, which is Wednesday week.

No Entry: Authorised Personnel Only

No Entry: Authorised Personnel Only

Block 1317

Block 1317

Earthlift Equipment

Earthlift Equipment

Scraping 1317

Scraping 1317

Scraping 1317... coming down...

Scraping 1317... coming down...

Painting the Ground

Painting the Ground

Written by marty in: Building, Land, Photos |
Aug
19
2009
1

On your marks…

…get set, GO!!!

Yes thats right we have a new site start date.  Its this coming Monday August 24th!  Its in the PD system so lets hope it stays there and we do start on Monday.

The PD 24/7 system shows us that the Administration part of the process is complete and we’re in the Construction phase.  Its full speed ahead from here.

PD 24/7 showing our progress

PD 24/7 showing our progress

What about the window issue I hear you say?  Well I won’t go into it but its all sorted and we got what we wanted, or should I say back to the way it is on their stock-standard floor plan.

Now that we’re starting stay tuned for a stack of photos of our progress!