Aug
30
2009

Day 7

Well, it’s really day 5. Michael was at the block on Friday just after lunch, and nothing has changed, so it’s “Before Lunch on Day 5″ photos… but Day 7 sounds luckier.

We have our pipes in the ground, all covered up, and ready for the slab to be prepared and poured later this week. Our pile of grey stuff has even shrunk too.

Our next door neighbours have flipped their plans over, so their driveway is actually the same side as ours - which looks OK based on their block progress so far - as their house looks to have its backyard actually at the back (rather than the side like ours) so our outdoor area should remain pretty private.

So, enjoy the progress so far!

Welcome to 1317

Welcome to 1317

Pipes: from the Front

Pipes: from the Front

1317's Electrical Box

1317's Electrical Box

Inside our electrical box...

Inside our electrical box...

Definately workmen on this site...

Definately workmen on this site...

Rubbish Container starting to fill...

Rubbish Container starting to fill...

Our smaller grey pile...

Our smaller grey pile...

Long shadow on the grey pile

Long shadow on the grey pile

Pipes: the Ensuite

Pipes: the Ensuite

Pipes: the Kitchen

Pipes: the Kitchen

Pipes: Main Bathroom

Pipes: Main Bathroom

Pipes: UFO

Pipes: UFO

Pipes: from the Rear

Pipes: from the Rear

Pipes: Rear of the Block

Pipes: Rear of the Block

Written by marty in: Building, External, Land, Photos |

No Comments »

RSS feed for comments on this post. TrackBack URL


Leave a Reply

Powered by WordPress | Theme: Aeros 2.0 by TheBuckmaker.com