Day 10

Well it’s the day before the slab is to be laid, and the framing for the foundation has been started.

Our UFOs have come a little closer down to earth, with all our pipes treated with the termite protection system. Which, well, we really don’t know what that means - the pipes have a little pink skirt now, so maybe it’s that, but all pipes have a bright yellow sticker telling us they’ve been termite proofed.

With tomorrow our concrete day (apparently), all that remains is the unpacking of our large polystyrene cubes into the frame, layering with remaining steel frames and then pour the concrete.

So guess where we’re going tomorrow afternoon?

One thing is a little strange though. It appears that Porter Davis 24/7 is stuck in a timewarp, as apparently the slab has already been laid, but is still dated as tomorrow. Whoops.

1317 takes shape...

1317 takes shape...

Frame Supports

Frame Supports

Portico and Block

Portico and Block

Portico and living area

Portico and living area

Across the alfresco to the bathroom

Across the alfresco to the bathroom

Corner to the Alfresco - frame and clips

Corner to the Alfresco - frame and clips

Supporting the frame

Supporting the frame

A look at the rear corner detail

A look at the rear corner detail

A look at the pipes... with lowered UFOs

A look at the pipes... with lowered UFOs