With lock up come and gone, it’s a little harder to get decent photos inside although when we were out there today, our Site Supervisor happened to be taking a look at the Regent down the street so, naturally, we asked if we could take a peek inside our house.
Our last look around the inside was with painters around so we couldn’t get into the bathrooms and it had that incredibly potent smell of fresh wet paint. Ahhh the fumes.
But the changes since our last update have been that ducts have been put in place (almost) for the heating and cooling, including the installation of our roof-top unit, and internal controller. Michael was itching to find the manual to take and study, but no, we can keep that there until handover - and over what is forecast to be a stinking hot summer, I think the following will be fine: Cool. On. Cooler. On. Yeah that’s about it.
Our painting inside is now complete too - our Kid Leather walls look sensational (bar a few expected touch up areas), and the feature in the bedroom, as mentioned, is spectacular. In the bathrooms, the waterproofing for the tiled areas has been put down and still has a strong head-spin odour to it, but that means we’re ready for tiles which are due to begin tomorrow and take a few days to get installed.
With slightly better light than the last photo batch, the cupboards look superb - and we’re glad to have the same colour - Burnished Wood - throughout the house (except our “Ice” benchtops in the kitchen, which are yet to be installed).
So apparently, from here, we have our tiles, taps, electrical and carpet to be installed, and then we should be at the final inspection leading up to the handover which should be early to mid December, all things continuing the way they are - hurrah!